“No Way The Floats Will Hold After All This”
338 ULTRA MAG High Flow float equipment with the Integral Debris Management System
338 ULTRA MAG High Flow float equipment with the Integral Debris Management System
The use of the Prenup enabled the use of an optimized cement slurry in which the thickening time was equal to placement time.
Prior to completion, 5.500 production casing was found to be leaking in the uncemented vertical.